2 feet of FROST but we are pouring concrete anyway! 🥶

Join the crew as we pour a bunch of concrete at the farm. This project needed to get done regardless of the weather. The excavator needed to rip through about 2′ of frost before we could grade and pour concrete. We got it done and it turned out good. Ready for the manure to flow! Enjoy

source

Author: avnblogfeed

ANGELHOUSE © 2009 - 2022 | HOSTING BY PHILLYFINEST369 SERVER STATS| & THE IDIOTS ROBOT AND CONTROL INC. |(RSS FEED MODULE)| ALL YOUTUBE VIDEOS IS A REGISTERED TRADEMARK OF GOOGLE INC. THE YOUTUBE CHANNELS AND BLOG FEEDS IS MANAGED BY THERE RIGHTFUL OWNERS (AVNBLOGFEED.COM)